Immediately detects Kicks at a very early stage, via an accurate real-time measurement of the difference between the mud flow Out and the mud flow In ( flow), in both water base and oil base mud systems |
EQUIPMENT for EARLY KICK & LOSS DETECTION GeoEK utilizes Electromagnetic Flowmeters to accurately measure the flow in water base mud, and the Coriolis Mass Flowmeters for water and oil base muds |
| |  |  | |
| | 8” Coriolis Mass Flowmeter Up to 3,500 liters/minute Resolution> 5 liters/minute Water Base and Oil Base Mud | Electromagnetic Flowmeter Resolution> 10 liters/minute Water Base Mud | |
| EARLY KICK & LOSS DETECTION EXAMPLES | | |
| |  Kick was detected very early: 0.16 m3 = 1 bbl | User Friendly screen: The Driller, Company Man and Toolpusher do NOT need to spend time looking at the various curves as the display gives automatically: · The amount of fluid gained or lost · The time from the start of the gain or loss | |
| | | | |
 Early Kick detection |  Accurate detection of a Loss: 0.18 m3 in 95 seconds |
| | | | |
BONUS Whenever the Electromagnetic Flowmeter or the Coriolis Mass Flowmeter is installed on the rig for Early Kick Detection the system can also detect opened fractures and provide valuable Reservoir information to the Oil Company. |  Early Kick detection prevents blowouts |